Client:
TACTILE STUDIO
Work:
TECHNICAL DEVELOPMENT, MANUFACTURING AND ASSEMBLY STRASBOURG ZOOLOGICAL MUSEUM
Comprehensive Museum Development and Installation
The project carried out for the Strasbourg Zoological Museum posed a large-scale technical challenge for the Proasur team. In this regard, we lead the way from design and customised production to the final assembly of the new museum layout. Thanks to our close collaboration with Tactile Studio, our work in this space enabled us to completely transform a two-storey building in accordance with criteria of construction excellence.
Engineering applied at the Strasbourg Zoological Museum
In order to ensure the success of the project at the Strasbourg Zoological Museum, we conducted a thorough review of the original designs. This allowed us to adapt each technical element to guarantee that the systems were fully operational. We also provided the following solutions:
Audiovisual Integration: We efficiently manage the installation of screens and lighting in custom-made furniture.
Precision Structures: We manufacture specific supports to ensure the viability of all systems.
International Logistics: We coordinate transport and access to operate directly at the museum’s headquarters.
Technical coordination at the Strasbourg Zoological Museum
The final execution at the museum demonstrates our expertise in leading large-scale international projects. Proactive management was key to synchronising the work of the various specialist suppliers. Similarly, through flexible planning, we were able to overcome the logistical challenges and tight deadlines presented by the environment. As a result, this coordinated effort enabled us to deliver a project that meets the highest standards of quality.





